World leader in testing and certification

Product category: Compliance Engineering
News Release from: Rohde and Schwarz | Subject: CMU300
Edited by the Electronicstalk Editorial Team on 8 March 2005

Basestation tester gains WCDMA options

Note: A free brochure or catalogue is available from Rohde and Schwarz on the products in this news release. Click here to request a copy.

Rohde and Schwarz has just expanded its compact basestation tester, the R and S CMU300, with numerous WCDMA options

This makes the R and S CMU300 the first measuring instrument to combine high-precision parameter tests with layer 1 signalling processes. It is now possible to test Node Bs (basestations with UMTS) under realistic, dynamic conditions. The instrument supports all key transmitter and receiver tests of the official 3GPP FDD specification.

HSDPA measurements are already feasible.

Because of increasing data throughput rates such as with HSDPA, radio links have to be matched ever more quickly to the available radio channel resources.

Time aspects of RF measurements are thus gaining more and more importance.

Static tests are currently being performed to find out whether the values of essential transmit parameters (power, modulation, spectrum, code domain) meet specifications.

Moreover, it is important to know whether these parameters are also set correctly and at the right time.

To comply with these requirements, the R and S CMU300 now combines RF parameter tests with layer 1 signalling processes.

As a result, the signalling mode now offers measurement functions that were previously impossible to implement or that required significant technical and financial efforts to do so.

By recording the Node B system clock, transmitter measurements can now be started at specific points in time without additional external triggering.

Critical system events such as changes in modulation mode can now be thoroughly analysed.

Existing measuring instruments can also benefit from the advantages offered by time-synchronous measurements via a trigger output on the R and S CMU300.

In the past, bit error rate (BER) tests were used to characterise the receive characteristics of a Node B.

The real-time receiver in the R and S CMU300 now uses the same method for testing the transmitter unit.

The instrument combines a data generator and data evaluator, making it easy to perform dataloop-based BER tests.

Moreover, test concepts can now be implemented that check whether the Node B transmitter responds to queries of the mobile terminal correctly and at the right time.

Thus, the radio tester features comprehensive test procedures for the random access channel (RACH), including measurement of the acquisition indication channel (AICH).

The broadcast channel (BCH) analysis function permits convenient evaluation of the cell system information.

The R and S CMU300 from Rohde and Schwarz is a platform that satisfies all areas in which 2G/3G basestation testing is applied: R and D, production, system testing, installation and service.

By providing HSDPA measurements and a WCDMA signalling mode, this platform offers efficient approaches to handling current 3G measurement tasks.

The hardware and software options are now available from Rohde and Schwarz.

Existing GSM/Edge instruments can be easily upgraded to WCDMA and HSDPA. Request a free brochure from Rohde and Schwarz....

Rohde and Schwarz: contact details and other news
Email this article to a colleague
Register for the free Electronicstalk email newsletter
Electronicstalk Home Page

Related Business News

Rider Resources Ltd. - First Quarter 2007 Results

Yamana Gold Reports First Quarter 2007...
...Results: Record Revenue and Earnings. Yamana Gold Inc.(nyse: AUY)(AIM: YAU) is pleased to announce its financial and operating results for the quarter ended March 31, 2007.

Goldcorp First Quarter Net Earnings Increase 32 Percent

Vault Energy Announces First Quarter Financial and Operating Results
Calgary, Alberta-- - Vault Energy Trust announces its consolidated financial and operating results for the three months ended March 31, 2007.

Crescent Point Energy Trust Announces First Quarter 2007 Results
Crescent Point Energy Trust, , is pleased to announce its operating and financial results for the first quarter ended March 31, 2007.

Search the Pro-Talk network of sites

World leader in testing and certification

Register for the FREE Electronicstalk email newsletter now! News about Compliance Engineering and more every issue. Click here for details.