Product category: Design and Development Software
News Release from: Vector Fields | Subject: Concerto and Opera
Edited by the Electronicstalk Editorial Team on 23 May 2005
Virtual prototyping brings radical ideas
to market
The use of simulation software is today an essential part of the design cycle, not only optimising functional design and cutting material costs but increasing company profits.
The use of simulation software is today an essential part of the design cycle, not only optimising functional design and cutting material costs but increasing company profits by significantly reducing "time to market" Virtual prototyping provides engineers with the ability to establish fundamentals of a new project before building prototypes, and allows the economic assessment of the "what if" scenario
This article was originally published on Electronicstalk on 30 Jul 2003 at 8.00am (UK)
Related stories
Software orchestrates microwave modelling
Vector Fields has upgraded its Concerto software for three-dimensional analysis and design of microwave components such as antennas, waveguides, microstrips and microwave heating etc.
Electromagnetic simulator gains thermal module
The rate of development of the Opera suite of simulation software for electromagnetic analysis has increased recently with the strengthened team at Vector Field's Oxford headquarters.
Analysis of design at this stage also permits use of minimal materials content without jeopardising quality and reliability.
Concerto and Opera, software from Vector Fields of Oxford enable radical designs to be simulated and tested at a fraction of the cost of traditional trial and error methods.
In the microwave spectrum, where visualisation is inherently difficult, one company reduced development time for from 1 person-year per prototype, to one designer analysing 60 designs in a single month using Concerto.
Further reading
Simulation optimises design of antenna array
A circular polarised patch antenna has recently been simulated using software from Vector Fields, and the simulation considerably reduced the development time.
Simulation helps provide cost-effective screening
Electromagnetic simulation has subs

